Not enough stock.
Your item was not added to your cart.
Not enough stock.
Please adjust your quantity.
Limit {{ product.max_order_quantity }} per order.
Only {{ quantityOfStock }} item(s) left.
1. White base | Put the white base upright first |
2. Transparent vat | The transparent vat is placed on the white base |
3. Faucet | Unscrew the nut on the faucet, take out two gaskets, stick one on the inside and outside of the bucket wall, then pass the faucet through the hole of the big bucket, tighten the nut, and the installation is complete. |
4. Maifan stone box | Put the Maifan stone box directly on the bottom of the vat |
5. Five-stage main filter | Screw the five-stage main filter element onto the white middle ring |
6. After installation, put it right | |
7. Put the screwed middle ring with five-stage filter element on the vat, the middle ring and the vat edge just match |
8. Ceramic Ball | Remove the gasket and lock teeth from the ceramic ball, and then pass the ceramic ball through the transparent bucket. |
The gasket is on the outside of the barrel. Note that the gasket is on the same side as the lock teeth, and then tighten the lock teeth. | |
9. White lid | Close the lid, installation is complete |
Transparent keg |
Maifan Stone Box |